Mailing Address:

PO Box 45188

Little Rock, AR 72214


Physical Address:

4520 West 30th Street

Little Rock, AR 72204


Main Office:

Phone: (501) 558-4901

Fax: (501) 558-4906


Receiving:

Phone: (501) 558-4908

Fax: (501) 558-4907

Featured Projects


Garver Engineers Corporate Office

North Little Rock

Job Number: GV-0247


August 2008 - August 2009

Description:
Garver Engineers, LLC was first established in Little Rock in 1919. Since then, the company has seen solid growth and a need to expand. The new 50,000 s.f. headquarters in North Little Rock's Northshore Business Park is LEED-certified "with many unique systems and amenities such as an on-site gym, indoor/outdoor bistro style eating area and an open floor plan maximizing views of the surrounding landscape."

Project Manager: Mike Massey, Head Foreman: Rick Barnard
General Contractor: Kinco, Architectual Firm: SCM, Engineering Firm: Garver Engineers


Fellowship Bible Church - New Campus

Little Rock, Arkansas

Job Number: FB-0225


October 2006 - May 2008

Description:
Fellowship Bible Church's new Little Rock campus is a 200,000 square foot facility located off Chenal Parkway in west Little Rock. Clark Power was pleased to install the buildings 3000 amp electrical service, generator, lighting controls, power and lighting systems, audio visual and theatrical lighting pathways, and through our subcontractors, the data, voice, fiber optics, access control, CCTV, fire alarm, intrusion detection, and lightning protection.

Project Manager: Mike Massey, Head Foreman: Jamie Cole
General Contractor: CDI Contractors, Architectual Firm: The Wilcox Group, Engineering Firm: TME, Inc.


St. James United Methodist Church

Little Rock, Arkansas

Job Number: ST-0228


December 2006 - April 2008

Description:
This particular project was divided by a main city street. The Worship Center was an expansion of the existing facilities. It also included 12,000 SF of educational space. The Christian Life Center is a brand new building and is located across the street from the existing facilities. All was completed simultaneously.

Project Manager: Mark Ingram, Head Foreman: David Van Pelt
General Contractor: CDI Contractors, LLC., Architectual Firm: RPPY Architectual Firm, Engineering Firm: Lucas-Merriot


Pulaski Heights United Methodist Church

Little Rock, Arkansas

Job Number: PH-0223


June 2006 - March 2007

Description:
Pulaski Heights United Methodist Church underwent a major renovation and added 6,000 SF. The Norma Story Educational Wing, Church Administrative Offices and Music Department were completely renovated.

Project Manager: Mark Ingram, Head Foreman: Cliff Sponsler
General Contractor: East harding Inc., Architectual Firm: Cromwell Architects/Engineers, Engineering Firm: Cromwell Architects/Engineers


Heber Springs Baptist Medical Center

Herber Springs, Arkansas

Job Number: HS-0218


April 2006 - June 2007

Description:

Project Manager: Mark Smitherman, Head Foreman: Rick Barnard
General Contractor: CDI Contractors, Architectual Firm: The Wilcox Group, Engineering Firm: TME, Inc.


Mount St. Mary McAuley Center Gym Renovation

Little Rock, Arkansas

Job Number: MS-0200


June 2005 - January 2006

Description:
The McAuley Center Gym was originally built in the late 1920's, and was the first multipurpose gym facility in the state with an indoor swimming pool. This renovation was the 3rd for this building. As part of this renovation, due to its age and resulting condition, the pool was filled and a new weight training room and classroom were put in its place. This renovation also brought air conditioning to gym and now the McAuley Center is one of the few high school gyms in the state with a/c.

Project Manager: Mark Smitherman, Head Foreman: Teal Tollett
General Contractor: Nabholz Construction, Architectual Firm: Jameson Architects, Engineering Firm: Lucas, Merriott & Assoc.


University Plaza Renovation

Little Rock, Arkansas

Job Number: UP-0201


June 2005 - January 2006

Description:

Project Manager: Mark Smitherman, Head Foreman: Jamie Cole
General Contractor: , Architectual Firm: Witsell Evans Rasco, Engineering Firm:


UAMS Residence Hall

Little Rock, Arkansas

Job Number: RH-0211


July 2005 - September 2006

Description:
UAMS determined to build a brand new 92,000 SF Residence Hall student housing. This was to replace the 50 year old Student Housing that was outdated and unable to meet the changing needs of UAMS students. This is part of the UAMS's Campus expansion.

Project Manager: Mark Ingram, Head Foreman: David Van Pelt
General Contractor: Baldwin & Shell Construction Company, Architectual Firm: The Wilcox Group, Engineering Firm: TME, Inc.


Jones Eye Institute

Little Rock, Arkansas

Job Number: JE-0187


July 2005 - January 2007

Description:

Project Manager: Fred Wisdom, Head Foreman: Chris Gordon
General Contractor: Baldwin & Shell, Architectual Firm: Polk Stanley Roland Curzon Porter Architects, Ltd., Engineering Firm: T.M.E. Inc.


First United Methodist Church Addition

Maumelle, Arkansas

Job Number: UM-0183


July 2004 - January 2006

Description:

Project Manager: Mark Smitherman, Head Foreman:
General Contractor: , Architectual Firm: Green Anderson Engineers, Engineering Firm: Green Anderson Engineers


Capitol Mall

Little Rock, Arkansas

Job Number: CM-0174


February 2004 - January 2005

Description:
A complete interior razing of an eight floor, eighty thousand square foot vintage building at the State Capitol Grounds complex. The facility was then completely renovated to serve the administrative offices of the Ark Department of Workforce Services.

Project Manager: Rusty Clark, Head Foreman: David VanPelt
General Contractor: Kinco Constructors, Architectual Firm: Steelman Connell Moseley, Engineering Firm: Pettit & Pettit Engineers


UALR Arena

Little Rock, Arkansas

Job Number: UA-0172


January 2004 - January 2005

Description:
Construction of a new Special Events Facility. This center houses a basketball arena with an approximate five thousand seating capacity and constructed to NCAA quality standards. This events center also houses a separate basketball practice court and other administrative class room areas.

Project Manager: Rusty Clark, Head Foreman: Jamie Cole
General Contractor: CDI Contractors, Architectual Firm: Witsell Evans Rasco, Engineering Firm: HKS Engineers


Springhill-Central Plant Expansion

North Little Rock, Arkansas

Job Number: CP-0171


January 2004 - January 2005

Description:
Construction or a three thousand square foot addition to the Mechanical & Electrical equipment room, and the installation of a new Emergency Generator system.

Project Manager: Floyd Vocque, Head Foreman: Tony Gray
General Contractor: Baldwin & Shell Construction, Architectual Firm: HKS/SSR, Engineering Firm: HKS Inc.


Pulaski Heights United Methodist Church

Little Rock, Arkansas

Job Number: PH-0165


October 2003 - June 2004

Description:
Addition of a two floor, fifteen thousand square foot Parking Deck and Education Facility to the existing Auditorium.

Project Manager: Fred Wisdom, Head Foreman: Chris Gordon
General Contractor: East-Harding Inc, Architectual Firm: Cromwell Architects/Engineers, Engineering Firm: Cromwell Architects/Engineers


Quigley Stadium Lighting

Little Rock, Arkansas

Job Number: QS-0145


March 2003 - June 2003

Description:

Project Manager: Steve Mayfield, Head Foreman: Tony Gray
General Contractor: Clark Power Corporation, Architectual Firm: ICE Engineers, Engineering Firm: I C E Engineers


Alotian Club House & Golf Facility

Roland, Arkansas

Job Number: AC-0142


October 2003 - January 2005

Description:
Construction of a new twenty five thousand square foot club house facility, and an eighteen hole PGA quality golf course.

Project Manager: Fred Wisdom, Head Foreman: Rick Barnard
General Contractor: CDI Contractors, Architectual Firm: Mark Finlay, Engineering Firm: Batson Engineers


Alotian Guest Cottages

Roland, Arkansas

Job Number: AH-0143


January 2004 - January 2005

Description:
Construction of fully furnished guest house facilities totaling eighteen thousand squart feet.

Project Manager: Fred Wisdom, Head Foreman: Rick Barnard
General Contractor: CDI Contractors, Architectual Firm: Mark Finlay, Engineering Firm: Batson Engineers


Remington College

Little Rock, Arkansas

Job Number: RC-0139


February 2003 - January 2004

Description:
Consists of a newly constructed two floor, fifty thousand square foot educational campus, complete with new parking areas and site lighting.

Project Manager: Fred Wisdom, Head Foreman: Teal Tollett
General Contractor: East-Harding Inc, Architectual Firm: Wittenberg-Delony-Davidson, Engineering Firm: Hargraves Engineer


Delta Dental Facilities

Sherwood, Arkansas

Job Number: DD-0138


April 2003 - January 2004

Description:
Delta Dental constructed these new administrative facilities in Sherwood. It consists of a new three floor, sixty thousand square foot facility, along with emergency power provision, and new parking areas.

Project Manager: Rusty Clark, Head Foreman: Chris Gordon
General Contractor: Baldwin & Shell Construction, Architectual Firm: Williams & Dean, Inc., Engineering Firm: Hargraves Engineer


Parkview High School Stage Lighting

Little Rock, Arkansas

Job Number: PS-0116


June 2002 - January 2003

Description:
Entails the installation of a new "state of the art" stage lighting and controls system in the existing Auditorium area.

Project Manager: Fred Wisdom, Head Foreman: David VanPelt
General Contractor: Clark Power Corporation, Architectual Firm: The Batson Firm, Engineering Firm: The Batson Firm


Immanuel Baptist Church

Little Rock, Arkansas

Job Number: IB-0109


March 2002 - May 2003

Description:
Immanuel Baptist Church relocated and constructed these new facilities in 2002. This new 175,000sf worship center includes new sanctuaries, worship center class rooms, administrative offices, theatrical lighting, television broadcasting services, emergency power provisions, and new parking facilities complete with area lighting. This site includes a gym/fitness area, and also accommodates a full service educational venue beginning with day-care and continuing through high school.

Project Manager: Floyd Vocque, Head Foreman: Jamie Cole
General Contractor: CDI Contractors, Architectual Firm: Cromwell Architects/Engineers, Engineering Firm: Cromwell Architects/Engineers


Cantrell West Office Building

Little Rock, Arkansas

Job Number: CW-0102


December 2001 - January 2003

Description:
Construction of a spacious, three floor, fifty thousand square foot office facility complete with new parking areas, site amenities, and site lighting.

Project Manager: Fred Wisdom, Head Foreman:
General Contractor: , Architectual Firm: Witsell Evans Rasco, Engineering Firm:


Metropolitan National Plaza

Little Rock, Arkansas

Job Number: MP-0086


September 2001 - November 2002

Description:
Construction of a spacious, three floor, fifty thousand square foot office facility complete with new parking areas, site amenities, and site lighting.

Project Manager: Fred Wisdom, Head Foreman: Jamie Cole
General Contractor: CDI Contractors, Architectual Firm: Sims-Grisham-Blair Architects, Engineering Firm: Sims-Grisham-Blair


Springhill Hospital Expansion

North Little Rock, Arkansas

Job Number: SH-0077


May 2001 - January 2003

Description:
The first phase on the Baptist Medical Springhill Hospital facility was completed in 1998. This 2001 expansion was for the addition of the third floor Patient-Bed Wing facilities.

Project Manager: Floyd Vocque, Head Foreman: Tony Gray
General Contractor: Baldwin & Shell Construction, Architectual Firm: HKS Inc., Engineering Firm: HKS Inc.


Donaghey Building Renovation

Little Rock, Arkansas

Job Number: DB-0073


April 2001 - January 2002

Description:
An extensive interior renovation to a vintage office building in downtown Little Rock, AR.

Project Manager: Fred Wisdom, Head Foreman: Eddie Jones
General Contractor: CDI Contractors, Architectual Firm: Wittenberg-Delony-Davidson, Engineering Firm: Hargraves Engineer